Castle Building Company Logo
digging out an existing crawlspace

We began this project by remodeling the upper level bath and bedroom to prepare for the crawlspace to basement conversion.

We took an existing, adjacent crawlspace area and converted it to a totally new and re-structured basement space ready to be finished. We built new steel supports and new concrete walls as well as re-worked the existing utilities. The new finished space has 8’6” ceilings with an incredible ceiling detail and barn wood wall accents that make the space rock!

When we completed the crawlspace to basement transition, we connected the bath and bedroom with beautiful wood floors and stairs into the gorgeous basement level family area complete with a walk up bar and a barn door to conceal built in shelves and desk/work space area. The special built-in work around the television was a creation from our master carpenter in conjunction with the homeowners and just the right finishing by the paint crew.

The excavation took about 3 1/2 months to complete and the finishing took an additional 90 days.